ValGold Reports Final Results of 2009 Drilling on Garrison Project
ValGold Resources Ltd. (TSX VENTURE:VAL) reported the results from the last three drill holes of the 2009 diamond drill program on its wholly owned Garrison gold property in north eastern Ontario.
The press release is quoted as saying:
During 2009, eleven diamond drill holes totalling 2,333 metres (“m”) were completed as a first step towards developing a resource calculation for the Garrcon shaft zones. The drill program involved step out and infill drilling on a minimum spacing of 25 to 30m. Multiple occurrences of visible gold were observed as fine disseminations in ten of the eleven holes drilled.
Click here to access the entire press release
Click here to access ValGold Resources Corporate Site
Comment |
|
Tweet |
|
All content Copright 2011 Dig Media Inc. Disclaimer
Reproduction Request
Fri, Mar 5, 2010
Post by Anne Bagchi, Gold Researcher